national standards of People's Republic of China

Code for design of oil and gas pipeline crossing engineering

Code for design of oil and gas transportation pipeline crossing engineering

GB 50423-2013

Compiling department: China National Petroleum Corporation Approval department: Ministry of Housing and Urban-Rural Development of the People's Republic of China Date of implementation: July 1, 2014

Announcement No. 267 of the Ministry of Housing and Urban-Rural Development of the People's Republic of China on Issuing the National Standard "Code for Design of Oil and Gas Transmission Pipeline Crossing Engineering"

The "Code for Design of Oil and Gas Transmission Pipeline Crossing Engineering" is now approved as a national standard, numbered GB 50423-2013, and will be implemented as of July 1, 2014. Among them, Articles 3.3.3, 4.1.2, 5.1.9, 6.1.9, 7.2.9 are mandatory provisions and must be strictly implemented. The original "Code for Design of Oil and Gas Transmission Pipeline Crossing Engineering" GB 50423-2007 shall be abolished at the same time.
This specification is published by the China Planning Publishing House organized by the Standard Quota Research Institute of our Ministry.

Ministry of Housing and Urban-Rural Development of the People's Republic of China
December 19, 2013

Foreword

In accordance with the requirements of the Ministry of Housing and Urban-Rural Development of the “Notice on Issuing and Revising Plans for Standardization of Engineering Construction in 2011” (Jianbiao [2011] No. 17), this code is organized by the Petroleum Engineering Construction Professional Standardization Committee to organize China Petroleum and Natural Gas Pipeline Engineering Limited The company, together with relevant units, amended on the basis of the national standard "Code for Design of Oil and Gas Transmission Pipeline Crossing Engineering" GB 50423-2007.
In the process of revision, the code preparation team combined with the construction practice of oil and gas pipeline crossing projects in recent years, and after extensive investigations and studies, carefully summarized the engineering practice experience, referred to relevant international standards and domestic advanced standards, and revised the code on the basis of extensive consultation.
This specification is divided into 8 chapters and 7 appendices. The main technical contents are: general rules, terms, basic provisions, trenching through design, horizontal directional drilling through design, tunneling through design, highway and railway crossing design, welding, testing And anticorrosive.
The main technical contents of the revision of this code are: 1) In the "3 Basic Provisions", the "3.5 Railway (Highway) Crossing" and "3.6 Selection of Tunnel Crossing Positions" sections of the original code have been deleted and replaced by The content is included in relevant chapters; 2) The design factor for gully crossing is added in 3.2.2, and the pipelines laid in mountain tunnels use different design factors according to the different classifications of the tunnel; 3) The trench is dug in "4 "Pass through design", the requirements and calculation content of "bare pipe laying" were canceled; requirements for riverbed sand mining and mining man-made activities to affect the pipeline; 4) in "5 directional drilling pass design", The drag calculation formula was revised; 5) In the "6 Tunnel Method Crossing Design", the buried depth of the shield tunnel and pipe jacking was revised in accordance with relevant domestic and foreign codes, supplementing the requirements for the waterproof rating of the tunnel, and the drill-and-blast method The parameters of the tunnel lining were revised based on engineering practical experience and the characteristics of the pipeline tunnel. The calculation requirements of the shield tunnel structure were added, the formula of the jacking force of the pipe was revised, and specific requirements for the layout of the relay station were proposed. 6) In "8 Welding, Pressure Test and Anti-corrosion", add 8.2.8, and put forward specific requirements for diameter measurement and tight pressure test before and after directional drilling through engineering pipelines.
The provisions marked with bold type in this specification are mandatory and must be strictly implemented.
The Ministry of Housing and Urban-Rural Development is responsible for the management and interpretation of the mandatory provisions, the petroleum engineering construction professional standardization committee is responsible for the daily management, and China Petroleum and Natural Gas Pipeline Engineering Co., Ltd. is responsible for the interpretation of specific technical content. If you have any comments or suggestions during the implementation, please send it to China National Petroleum Pipeline Engineering Co., Ltd. (Address: No. 146 Heping Road, Langfang City, Hebei Province, Post Code: 065000).
The main editing unit, participating editing unit, main drafter and main reviewer of this code:
Compiling institutes: China National Petroleum Pipeline Engineering Co., Ltd.
Participating organization: Shengli Oilfield Investigation and Design Institute Co., Ltd.
Third Railway Survey and Design Institute Group Co., Ltd.
Southwest Branch of PetroChina Engineering Design Co., Ltd.
Main drafters: Shi Hangcheng, Mengpeng, Zhang Wenwei, Jian Zhaoming, Li Guohui, Pu Gaojun, Liu Jianwu, Zhang Huasheng, Yan Qinghua, An Yuhong, Meng Qing, Yu Ganji, Wang Xiaofeng, Li Qiang, Ma Xiaocheng, Xu Jie, Xiang Bo, Chen Wenbei, Zhan Shengwen, Ma Hongxin, Gao Hong, Wang Honglu, Jiang Zhangzhiguang, Liu Qimin, Li Zhiyong, Chen Jie, Wang Guitao, Liu Yandong, Tang Peilian, Yang Weizuo Lei Bin, Tie Mingliang, Ma Zhifu, Ren Qirui
Main reviewers: Wang Shukuan, Zhao Binggang, Zhang Huaifa, Liu Yihui, Liang Yuteng, Tan Mingxing, Yin Gangqian, Wang Xiaolin, Liao Deyi, Pang Xinfeng, Li Xiaoxi, Hu Yinxue, Yu Jinglong, and Fan Heqin